Go Back
All Projects Auto Dealerships Commercial Educational Industrial Medical Religious Small Projects

Straight Edge Striping

REDCOM Design and Construction is leading construction of Straight Edge Striping’s new facility in Middlesex, NJ.

The 29,500-square-foot project, which began in late June, is expected to be complete by the end of summer 2025. This new space will include an industrial office, spacious warehouse, and three exterior storage sheds. 

This is not the first time REDCOM has partnered with Straight Edge Striping. Six years ago, REDCOM designed and built their previous location. Since then, the company has experienced significant growth. Their new facility is strategically designed to better support their expanding operations.

Services Utilized:  Engineering, architecture and construction management

Location:  Middlesex, NJ

Project Stats:  29,500 SF

Completion Date:  Began construction June 2024

Aerial view of a construction site with a partially completed building foundation, construction vehicles, equipment, and materials organized around the area.

Straight Edge Walls Tilted up: Aerial View

Tilting up these walls is no simple task. Beyond the physical challenges, achieving the correct size and fit for these massive concrete slabs requires exceptional precision.

Unlike wood, where adjustments can be made on-site, concrete slabs leave no room for error. One cannot shave off a piece of concrete if the slabs are the wrong size. A miscalculation not only risks a significant delay– potentially over a month while the new slabs cure– but also threatens the project’s budget.

With walls now successfully tilted up, the next phase will involve installing structural steel and roofing.

Schedule a Free Consultation!